Cookies
We use analytics cookies to see which pages help people plan their build, so we can improve them. No ads, and we don't sell your data. You can change this any time under Cookie settings. Privacy policy
The all-in-one platform for building in Ghana: free cost calculator, AI floor plans, a materials & labour marketplace, and construction management - whether you design with us or bring a house you're already building.
Cost calculator, AI floor plans, a materials marketplace and construction management, all in one place.
Building from abroad? Plan, price, and track your Ghana project with more control.
Where are you in building your house?
Building from abroad? Plan, price, and track your Ghana project with more control.

This house: 9 bedrooms · 3 storeys · 432 m²
Total estimated cost
GHS 1,795,565
Measured from the generated floor plan
One platform, three stages
Most tools stop at a drawing. GhanaHousePlanner carries the same house from its cost, to a code-checked design, to the build itself, with self-serve tools and our team on call at every stage.
Ghana-specific prices for every region, including the items informal quotes tend to leave out.
Our team can help

Describe your home to the AI Design Agent, or upload a plan you already have. Either way, every room is checked.
Our team can help

Bring a house you're already building, with us or anyone else, and run it like a project: phases, budget, team and documents in one place, with progress straight from the site.
Our team can help
Kwame asks what an architect would: who lives with you, how big your plot is, which side the road is on, how you cook and host. Then it arranges the rooms around your answers. The layout options above are ready-made; this one is drawn from your brief.
Your free welcome credits cover your first design. Saving and downloading it need a Starter or Professional plan.
Watch a house plan come together in 2D and 3D, or click through the platform yourself before you sign up.
Demo not loading? Open full-screen demo →
Tools and services for every stage, and for the people who build for a living.
Accurate pricing and materials for Ghanaian construction




Design, compliance, cost, materials, and site supervision stay in one connected project — not scattered across separate calculators, marketplaces, and spreadsheets.
Watch how Ghanaians in the UK, USA, and Canada are using GhanaHousePlanner to plan, budget, and track their builds back home — without being on-site.
Tap to start — from anywhere
The only platform providing end-to-end building certainty for the Ghanaian market.
| Feature | GhanaHousePlanner | Planner 5D | Maramani |
|---|---|---|---|
| Ghana-Specific Pricing | All 16 regions | Generic | Limited |
| GhBC Compliance | Built-in | No | No |
| Project Management | Free tier | No | No |
| Diaspora Features | Real-time tracking | No | No |
| Material Sourcing | CornerStore, with supplier ratings & reviews | No | Limited |
| Buyer Payment Protection | Escrow, held until delivery confirmed | Not offered | Not offered |
| Cost Accuracy | ±5-10% | Varies widely | Varies widely |
| BIM Export (IFC · DXF · GLTF) | Pro & Starter | Not offered | Not offered |
| UCC & KNUST Research Backing | Validated | None | None |
Not guesswork. Our pricing engine is validated by a parametric study that quantified Ghana's "Completeness Gap" — the systematic shortfall between informal contractor quotes and real construction costs.
"A family budgets GHS 600,000 for a 3-bedroom home. Our research shows the actual cost is approximately GHS 790,000 — they are GHS 190,000 short before they break ground."
— Emmanuel Apaaboah & Bernard Opoku, University of Cape Coast / KNUST, 2026
Join thousands using GhanaHousePlanner to estimate costs, compare regions, and plan homes in Ghana.
No credit card required • Free cost calculator • Optional AI design, editor, exports, and project tools