Every floor plan you design becomes a real 3D model — walk through every room, see it in daylight, and export it as an industry-standard IFC, GLB, or DXF file.
Real geometry — hosted doors and windows, correct wall joins, modelled furniture — so the exports hold up in professional software.
Move through every room and floor in a floating dual-zone touch/mouse walkthrough that works on desktop and phone alike.
Doors and windows hosted in their walls, correct wall joins, and modelled furniture — one relationship per object type, not a rough shell.
A lightweight 3D file that opens in any GLB-compatible viewer, game engine, or AR tool for quick sharing.
Calculated from your plot's real latitude in Ghana, so you can see how daylight moves through the house before it's built.
A CAD-ready DXF alongside the 3D model, with walls broken at their openings for accurate 2D reference.
No app to install — the viewer and walkthrough run in the browser on a laptop, tablet, or phone.
The 3D model is one stage of GhanaHousePlanner's construction operating system — the same floor plan carries through design, visualization, documentation, and procurement.
Describe your home to our AI Design Agent or build it yourself in the floor plan editor.
Walk through the design in 3D and export a Revit-grade IFC or GLB model — you are here.
Generate a permit-ready architectural and structural drawing set.
Turn the same design into a bill of quantities and buy materials through CornerStore.
IFC (Industry Foundation Classes) is the standard BIM file format used by Revit, ArchiCAD, and other professional design software. Our export models real openings hosted in walls, correct wall joins, and furniture — not just a rough shell — so it opens cleanly in professional BIM tools.
Yes — export a GLB for a lightweight viewer or game engine, a DXF for CAD software, or an IFC for BIM tools like Revit, whichever your architect or contractor already uses.
Yes. The sun and shadow study is calculated from your plot's actual latitude in Ghana, so you can check how rooms and windows perform at different times of day before construction starts.
Yes, the 3D viewer and walkthrough controls are built for touch and work on a phone or tablet as well as desktop.