No design software to learn. Tell Kwame how many bedrooms you want, the style, and any specific rooms — get back a Ghana Building Code-compliant floor plan, then keep chatting to refine it room by room.
Kwame turns a conversation into a real, code-checked floor plan.
Describe bedrooms, style, and specific rooms in plain language — no floor plan software to learn.
Room sizes are checked against GS 1207:2018 minimums as the plan is generated, not after the fact.
Keep chatting to add a room or change a floor, and your existing style and requirements carry forward instead of resetting.
Ask for specific rooms on specific floors — 'an office on the ground floor' — and Kwame places them accordingly.
Once you're happy with the plan, view it in 3D or generate a full architectural drawing set immediately.
Free for anyone designing a home, with a dedicated free Student Design Studio for architecture and construction students.
The AI Design Agent is the first stage of GhanaHousePlanner's construction operating system — the plan Kwame generates carries straight through visualization, documentation, and procurement.
Describe your home to our AI Design Agent — you are here.
Walk through the design in 3D and export a Revit-grade IFC or GLB model.
Generate a permit-ready architectural and structural drawing set.
Turn the same design into a bill of quantities and buy materials through CornerStore.
Describe the number of bedrooms, style, and any specific rooms you want (an office on the ground floor, an extra bathroom, a boys' quarters). Kwame turns that into a floor plan and keeps your requirements as you keep chatting and refining it.
Yes — room sizes and dimensions are checked against GS 1207:2018 minimums (for example, a minimum 13.47 m² living room and 11.15 m² main bedroom) as the plan is generated.
Yes. Keep chatting to add rooms, change the style, or move things between floors, and your existing requirements carry forward instead of resetting to a default plan.
Anyone can chat with the AI Design Agent to generate a floor plan for free. Architecture and construction students get a dedicated free Student Design Studio with the same compliance feedback.