🎉 Selected for the ARCE 2026 PropTech Startup Cohort — meet us in Accra· Oct 14–16, 2026 ·

Building from abroad? Plan, price, and track your Ghana project with more control.

Before you send money, hire a contractor, or break ground, get a realistic budget for your home. Compare all 16 regions, see the hidden costs, and plan with fewer surprises.

Chat on WhatsApp

No credit card required • Free cost calculator • Optional AI design, editor, exports, and project tools 🇬🇭

🤖 AI Design Agent✅ Free Calculator🇬🇭 Made for Ghana📐 GS 1207:2018 Compliant
16
Ghana Regions
100+
Materials Tracked
10,000+
Active Users
Free
Calculator

See It in Action

Follow along with an interactive demo — click through each step and learn how to design your floor plan before you sign up

Demo not loading? Open full-screen demo →

Plan with the numbers first

Start with a free estimate, then move into design, materials, and project tracking when you are ready.

Estimate your likely build cost using Ghana-specific pricing across all 16 regions.

AI floor plans follow Ghana's building code — room sizes, setbacks, and structural rules built in.

Describe the home you want and generate a starter floor plan you can refine.

Have a house plan from another designer or architect? Upload a photo or PDF and we'll rebuild it as a compliant, costed design — flat fee, no redrawing.

No floor plan needed. Add your project's basics and manage budget, documents, team, and site supervision — even if you're building without us, free.

Track phases, materials, and budgets as your project moves from planning to construction.

CornerStore Marketplace

Find materials, equipment, and skilled labour from suppliers when you're ready to buy.

Verified site logs, milestone payments, and defect tracking — for owners who can't be on-site daily.

Get matched with a licensed architect, verify a land title before you buy, or request a vetted site supervisor — fee quoted upfront.

Export floor plans as IFC, DXF, or GLTF — ready for architects and engineers to build on.

How It Works

Move from rough idea to realistic budget quickly.

1

Enter Your Build Details

Choose your region, house type, rooms, size, and finish level.

2

See the Cost Breakdown

Review materials, labour, regional effects, and likely hidden costs before you commit money.

3

Plan the Next Step

Refine your floor plan, share your estimate, source materials, or start tracking the project.

See Your Build in 3D Before Breaking Ground

Watch how investors use GhanaHousePlanner to plan chamber & hall rental construction — from AI floor plan to full 3D walkthrough — before spending a cedi on materials

Built for the real problems of building in Ghana

Design, compliance, cost, materials, and site supervision stay in one connected project — not scattered across separate calculators, marketplaces, and spreadsheets.

For Homeowners

  • Estimate your likely budget before you start
  • Get compliant designs that pass inspection (no rejections)
  • Buy materials at fair prices, escrow-protected until delivery, from rated suppliers
  • Free calculator with optional advanced tools

For Diaspora

  • Manage your project from USA, UK, Germany, or Canada
  • See real-time progress with site photos
  • Control budget and catch leakage immediately
  • More transparency before sending money

For Contractors

  • Access verified projects and material lists
  • Collaborate with homeowners and suppliers
  • Track timelines and budgets professionally
  • Build your reputation on CornerStore

For Suppliers

  • Connect directly with verified buyers
  • Grow your business on CornerStore
  • Fair pricing, no middleman markup
  • Reach diaspora investors with capital
Beautiful home in Ghana

Building from the Diaspora?

Watch how Ghanaians in the UK, USA, and Canada are using GhanaHousePlanner to plan, budget, and track their builds back home — without being on-site.

Tap to start — from anywhere

Why GhanaHousePlanner vs. Competitors?

The only platform providing end-to-end building certainty for the Ghanaian market.

FeatureGhanaHousePlannerPlanner 5DMaramani
Ghana-Specific Pricing All 16 regions Generic Limited
GhBC Compliance Built-in No No
Project Management Free tier No No
Diaspora Features Real-time tracking No No
Material Sourcing CornerStore, with supplier ratings & reviews No Limited
Buyer Payment Protection Escrow, held until delivery confirmed
Cost Accuracy ±5-10% Could be extreme Could be extreme
BIM Export (IFC · DXF · GLTF) Pro & Starter
UCC & KNUST Research Backing Validated
Peer-Reviewed Research · University of Cape Coast & KNUST · 2026

Our Cost Model Is Backed by Academic Research

Not guesswork. Our pricing engine is validated by a parametric study that quantified Ghana's "Completeness Gap" — the systematic shortfall between informal contractor quotes and real construction costs.

29–98%
Typical gap between informal quotes and actual costs
6
Items systematically omitted from contractor quotes
3
Real Ghanaian homes independently validated

"A family budgets GHS 600,000 for a 3-bedroom home. Our research shows the actual cost is approximately GHS 790,000 — they are GHS 190,000 short before they break ground."

— Emmanuel Apaaboah & Bernard Opoku, University of Cape Coast / KNUST, 2026

Also built for students and professionals

Planning to build your own home? You're already covered above. Learning to design, or managing a full project portfolio? We've built a dedicated path for that too.

Design a floor plan and get instant Ghana Building Code compliance feedback — free, no payment required.

Manage every project from one dashboard — reusable layouts, drawing/DXF exports, and bill of materials.

Start with the cost. Build with fewer surprises.

Join hundreds using GhanaHousePlanner to estimate costs, compare regions, and plan homes in Ghana.

No credit card required • Free cost calculator • Optional AI design, editor, exports, and project tools 🇬🇭