No app to download. No form to fill. Message +233 59 317 7242 and get a real, Ghana-priced construction cost estimate back in seconds.
Chat on WhatsApp+233 59 317 7242
Describe your house in plain language — "3 bedroom house in Kumasi" — and get a real, region-priced estimate with a floor plan, no app download.
Cement, blocks, sand, roofing sheets, rebar, tiles — current prices, straight in the chat.
Search verified suppliers by material and location — "cement in Accra" — and request a quote without leaving WhatsApp.
Reply SAVE and your estimate becomes a real project in your free GhanaHousePlanner account, ready to pick up on the web whenever you want.
Send a photo from site and it lands in your project's site log, on the stage in progress, with the time it arrived — no app to open.
No menus to hunt through, no jargon. Say what you're building the way you'd tell a friend, and the assistant works out the rest.
Photos from site usually end up buried in a chat. Link your number once and every photo or note you send lands in your project's site log instead — dated, on the right stage, and there for anyone on the project to see.
In your GhanaHousePlanner account, tap “Link my WhatsApp” and press Send on the code it opens in WhatsApp. That's it — your number is tied to your account.
Send a photo with a caption, or a note starting with LOG — “LOG blockwork up to lintel level”. Several photos sent together become one log.
The log goes to the stage in progress, stamped with when it arrived. Share your location and it's attached too. Got more than one build? It asks which one.
Site logs are a Starter feature, based on the project owner's plan — the free 14-day Starter trial includes them.
Yes. Messaging the bot and getting estimates, material prices, and supplier searches is free — you're just sending a normal WhatsApp message.
No. If WhatsApp is already on your phone, you're ready — nothing to download, no account needed to start chatting.
It runs on the same Ghana-priced, regionally-adjusted cost engine as the web calculator — built on peer-reviewed research with the University of Cape Coast and KNUST, not a generic guess.
Yes — reply SAVE after an estimate and it becomes a real project in a free account, with the floor plan and numbers already there.
Yes. Anyone on your project team who can update its progress can link their own WhatsApp number and log from site — each log shows who sent it. You stay in control of who's on the team from the web.
Into the project's site log on GhanaHousePlanner, on the construction stage in progress, with the time they arrived and the location if you shared it — so the record lives with your project, not scattered across a chat.
Site logs are part of the Starter plan (GH₵500 a year), and the project owner's plan is what counts — so your builder can log to your project on their own free account. New accounts can try Starter free for 14 days.
Message us and get your first estimate back before you'd have finished signing up anywhere else.
Chat on WhatsApp