Bill of Quantities in Ghana: PDF or Excel, by Trade or SMM7, Priced for Your Site [2026]

What a bill of quantities is, how a quantity surveyor in Ghana expects it laid out, and how GhanaHousePlanner's BOQ now prices delivery to your site, follows your region's rates, and exports to Excel with live totals — by trade or by SMM7 work sections.

GhanaHousePlanner Team
10/28/2026
7 min read
bill of quantities GhanaBOQ GhanaBOQ ExcelSMM7 bill of quantitiesquantity surveyor Ghanaconstruction cost Ghana

Bill of Quantities in Ghana: PDF or Excel, by Trade or SMM7, Priced for Your Site

A cost estimate tells you roughly what your house will cost. A bill of quantities (BOQ) tells your quantity surveyor, contractor, or bank exactly how that figure was reached: every item, its unit, its quantity, its rate, and its amount, grouped into sections and carried to a grand total. It is the document you tender with, finance against, and check your contractor's requests against.

GhanaHousePlanner builds your BOQ from the same data as your cost estimate and your floor plan. This guide explains what is in it, the two ways it can be laid out, and how its rates now reflect where you are building.

What a BOQ Contains

▸Sections, each with a subtotal: groundwork and concrete, masonry, roofing, windows and doors, finishes, plumbing, electrical, external works
▸Lines with item, unit, quantity, rate, and amount — for example, so many bags of cement at your region's rate, so many sandcrete blocks, so many lengths of Y12 rods
▸Preliminaries: labour, design fees, permit fees, and a contingency for price changes
▸A grand total that matches your estimate

Two Arrangements: By Trade or by SMM7

Different readers expect different layouts, so you can pick either when you export.

By trade is our own layout and the default: Substructure, Superstructure, Roofing, Plumbing Installations, Electrical Installations, Finishes & Joinery, External Works, then Preliminaries & Provisional Sums. It reads naturally for an owner, a contractor, or a family member following the build.

SMM7 work sections is the arrangement Ghanaian quantity surveyors work to. The bill follows the Common Arrangement of Work Sections:

SectionWork sectionExamples from your bill
APreliminariesScaffolding, waste disposal, labour, fees, contingency
DGroundworkSite preparation, termite treatment
EIn situ concreteCement, sand, chippings, reinforcement, formwork
FMasonrySandcrete blocks, lintels, damp-proof course
G, HRoof timber and coveringRoofing timber, roofing sheets, ridge caps
LWindows, doors and stairsDoors, aluminium windows, staircase
MSurface finishesTiles, adhesive, paint
R, SDrainage and water supplySeptic tank, soakaways, pipes, tanks
VElectricalCables, sockets, distribution board, solar

Every line gets a reference (E1, E2, F1…), and a collection page lists each section's total before the grand total, so a quantity surveyor can check and price it the way they are used to. One honest note: our quantities are the estimate's supply quantities, and labour is a single sum under A, so the bill is arranged by SMM7 rather than measured to its rules.

PDF or Excel

The PDF is ready to send: to a contractor for a tender, to a bank with a loan application, or to family abroad who are funding the build.

The Excel export is for working on. It is a real .xlsx file with two sheets, Bill and Collection, and the figures are live formulas: each amount is quantity × rate, each section total is a sum of its amounts, and the collection pulls each total from the bill. Change the rate for cement after a supplier's quote, or adjust a quantity after your quantity surveyor's measure, and every total updates.

Rates for Your Region

A bag of cement doesn't cost the same in Tamale as in Tema. Manufactured goods such as cement, steel, and roofing sheets travel from the factories and ports in the south, so they cost more the farther north you build; sand and stone are dug locally and are often cheaper away from Accra. Every line of your BOQ carries your region's rate, so the lines add up to the regional estimate rather than to Accra prices.

Delivery to Your Site, Priced In

Transport is one of the costs builders most often forget, and it isn't the same for every site. A plot in town with block factories and quarries nearby pays very little for delivery; a site 30 km out on a rough road pays much more for every trip of sand.

In the Cost Estimator, choose how far your site is from your suppliers:

Distance to suppliersDelivery cost
Within 5 kmAs priced
6–15 km1.5 times
16–50 kmTwice
Over 50 km2.5 times (get a delivery quote)

Only the delivered part of a price goes up, and only for bulky materials. Sand and stone, sold by the delivered trip, rise the most; blocks and timber less; cement, steel, and roofing sheets a little; fittings, cables, and paint not at all. The estimate tells you how much delivery adds, and the BOQ's rates include it.

How to Get Your BOQ

1Run the free cost calculator with your bedrooms, area, finish level, region, and distance to suppliers, or design your house with the AI Design Agent first

2Save the project and open its Materials tab, where the bill of quantities lives
3Choose the arrangement, by trade or SMM7 work sections, and download the PDF or the Excel file

The estimate, the BOQ's total, and its trade subtotals are free. Every line and the PDF and Excel exports come with the Starter and Professional plans.

Where the BOQ Goes Next

▸Tendering: send the same bill to several contractors and compare like with like
▸Financing: banks and mortgage lenders ask for one with a construction loan (see our construction financing guide)
▸Buying materials: order against it on CornerStore instead of guessing at the hardware store counter
▸Controlling the money: check every request for cement or blocks against the bill (see why building costs overrun in Ghana)

Get your estimate and bill of quantities →

Ready to Start Your Construction Project?

Use our advanced cost calculator to get accurate estimates for your building project in Ghana

Related Articles

Already Have a House Plan? Here's Everything Still Standing Between You and a Finished House in Ghana [2026]

A friend's architect drew it, a plan book sold it to you, or a designer sent a PDF and disappeared — either way, a plan on its own doesn't build a house. Here's the full path from an existing drawing to a finished, supervised build.

GhanaHousePlanner Team
9/4/2026
8 min read
Read More

Already Have a House Plan? Upload It and Get a Ghana Building Cost Estimate [2026]

Got a finished floor plan from another designer, a plan book, or a friend's architect? Upload it to GhanaHousePlanner and get it rebuilt as a Ghana Building Code-compliant plan with a real cost estimate — no redrawing from scratch.

GhanaHousePlanner Team
8/31/2026
5 min read
Read More

Construction Costs Ghana 2026: How Much to Build Per Square Meter [₵2,500-₵6,000/m²]

Updated 2026 prices: Build cost ₵2,500-₵6,000 per m² depending on finish level. Free cost calculator for all 16 regions. Budget accurately for your Ghana construction project.

GhanaHousePlanner Team
1/8/2026
8 min read
Read More