Chat on WhatsApp
Built for Diaspora & Local Homeowners

Site Visits are Expensive.
Monitoring Shouldn't Be.

You can't be on the building site every day. GhanaHousePlanner gives you the remote oversight you need to prevent "ghost" workers and track material usage in real-time.

Professional Stage-by-Stage Tracking

We break down your construction into 9 manageable phases based on Ghana Building Standards — and you can request supplier quotes for each stage individually.

Stage 1: Site Prep & Pegging

Soil testing, land clearing, and accurate site pegging by licensed surveyors.

Stage 2: Foundation & DPC

Concrete pouring, damp-proof course, septic tank, and drainage.

Stage 3: Structural Blockwork & Steel

Sandcrete block laying, ring beams, columns, and steel reinforcement.

Stage 4: Roofing Installation

Trusses, purlins, aluminum sheets, ridge caps, and gutters.

Stage 5: Plumbing First Fix

PVC supply and soil pipes, water tanks, and pressure testing.

Stage 6: Electrical Rough-in

Conduit, cabling, distribution board, circuit breakers, and ECG connection.

Stage 7: Mechanical Systems

AC units, solar power, CCTV security, smart home — installed after rough-in.

Stage 8: Finishing Works

Plastering, tiling, ceiling, doors, windows, and kitchen fit-out.

Stage 9: External Works & Painting

Interior and exterior painting, compound wall, gates, and driveway.

Why Diaspora Families Trust Our Platform

Site Photo Verification

Require your contractors to upload real-time site photos before releasing the next budget milestone.

Role-Based Oversight

Invite your foreman, architect, and surveyor to the same digital dashboard for 100% transparency.

Stop Material Leakage

Compare actual site spending against your original estimate to catch 'missing' cement or steel immediately.

85%

Reduced chance of project delays

GH₵ 50k+

Average savings on material waste

Frequently Asked Questions

How do I monitor my building project from the UK or US?

Our platform provides a real-time dashboard where you can see completion percentages for each phase and view photos uploaded by your site foreman.

Does the platform work on mobile phones?

Yes, GhanaHousePlanner is fully responsive. You and your contractors can access everything from a smartphone on-site.

Can I invite multiple contractors to one project?

Absolutely. You can add your mason, electrician, and plumber as collaborators to ensure everyone is working from the same house plan and material list.

Ready to build with transparency?