Chat on WhatsApp
International Expansion

Bring GhanaHousePlanner to your market

The gap between what a contractor quotes and what a house actually costs isn't a Ghana problem — it's an informal-construction-market problem. We're looking for in-market partners to license our platform and bring it to their country.

Why this matters

This problem isn't unique to Ghana

Across most of Sub-Saharan Africa, homeownership happens through incremental, owner-driven self-build — financed little by little, with no mortgage, no quantity surveyor, and no systematic cost planning. That's where these numbers come from.

1.8–2.2M
Ghana's residential housing deficit (units)
29–98%
How much informal contractor quotes underestimate true cost
1 in 5
Structures in Ghana left uncompleted (2021 Census)

Ghana-specific figures from our own published research and the 2021 Ghana Population and Housing Census.

Proven in Ghana

A platform already doing this — in one market

GhanaHousePlanner is a live, operating platform — not a pitch deck. Every capability below is running today for real self-builders in Ghana.

Parametric cost estimation

Itemised bills of quantities, not flat per-m² guesses

AI floor plan generation

Chat-based and manual generators producing code-aware layouts

3D visualisation

Photorealistic walkthroughs from the generated floor plan

Professional export

IFC, DXF and GLTF output for BIM and CAD tools

Construction phase tracking

From site preparation through to handover

See it in action

Don't take our word for it

Real usage, from our own channels — before you put your name behind this in a new market, see what your clients would actually be using.

Planning a chamber & hall rental build, start to finish

Building in Ghana from abroad — the diaspora use case

The model

You bring the market. We bring the platform.

What partners get

  • The GhanaHousePlanner platform: cost estimation, AI floor plan generation, 3D visualisation, and professional BIM/CAD export
  • A building-code and material-cost engine calibrated to your market, built together with your local expertise — not assumed from ours
  • Brand, marketing, and go-to-market support drawing on what we've learned building this in Ghana
  • A defined licensing and revenue-share agreement, negotiated per partner and per market
The bar

What we're looking for in a partner

We're selective on purpose. A bad partner in a new market can burn the opportunity for years — so we're looking for real standing, not just enthusiasm.

Standing in your market

A quantity surveyor or architecture practice, a real estate developer, a construction-tech founder, a professional body — or a capable operator or entrepreneur without a construction background, provided you can partner with people who have it. Domain expertise matters more than where it sits.

Real knowledge of local construction — yours or your team's

Building codes, dominant construction methods, and material costs vary enormously by country. Getting this wrong isn't just an accuracy problem, it's a safety one — so someone on your side needs to know what's actually true in your market.

A team, or the will to build one

Whether you're a solo practitioner or an established company, we want to understand your capacity to support a serious, multi-year effort — not a side project.

Questions you're probably asking

Is the platform already adapted for my country?

Not yet, and we won't claim it is. Building codes, dominant construction methods, and material pricing differ by country in ways that go well beyond translation — getting this wrong isn't just an accuracy problem, it's a safety one. We calibrate each market's engine together with a qualified local partner before anything goes live there.

What does a partnership actually cost?

There's no fixed price list. Terms — licensing fees, revenue share, what each side contributes — are worked out individually based on market size, your standing, and what a genuine pilot looks like. We'll only discuss specifics once we've had a real conversation.

How many countries are you taking on right now?

A small number, deliberately. We'd rather get one market genuinely right, with a partner who has real local credibility, than spread thin across many at once.

What happens after I submit the form?

Our team reviews every inquiry individually — this isn't an instant sign-up. If it looks like a good fit, we'll follow up to have a real conversation about your market and your background.

Get in touch

Tell us about your market

This starts a conversation, not a contract — we review every inquiry personally.

Submitting this form starts a conversation, not a contract. We review every inquiry individually.