Chat on WhatsApp
Illustration of a student thinking through a building design
Free for students

Design a Ghana Building Code compliant home — free, learn as you go

Generate a floor plan, start from a blank canvas with code-compliant starter shapes, edit it by hand, and check GS 1207:2018 compliance whenever you want — with a built-in chat that can explain what's wrong or comment as you draw. No payment required.

What's included

Everything below is free — no sign-up fee, no credit card, no trial period.

AI-assisted design

Describe the home you want and get a real floor plan generated in seconds.

Start fresh or use starter shapes

Clear the canvas and design from scratch, or drop in pre-sized room shapes — bedroom, kitchen, bathroom, and more — already sized to meet code minimums.

Edit by hand

Rework any room, wall, door, or window yourself in a real floor plan editor.

Compliance check, on demand

See exactly where your design meets — or misses — Ghana Building Code (GS 1207:2018) minimums, whenever you want to check.

Ask questions as you draw

Ask "what's wrong with my bedroom?" and get a straight answer grounded in your actual compliance report — the chat can also comment on its own after you've been drawing for a bit.

© 2026 GhanaHousePlanner. Ghana Building Code-compliant floor plan design, free for students.