Cookies
We use analytics cookies to see which pages help people plan their build, so we can improve them. No ads, and we don't sell your data. You can change this any time under Cookie settings. Privacy policy
GhanaHousePlanner now exports floor plans in IFC (Revit, ArchiCAD), DXF (AutoCAD, QCAD), GLTF (Blender), and PNG. Learn how clients and architects can collaborate — design on GhanaHousePlanner, then hand off a BIM-ready file for permits and construction.
GhanaHousePlanner has always made it easy for Ghanaians — at home and in the diaspora — to design their own floor plans with AI. Now, those designs don't stop at a screen. You can export your floor plan in four professional formats and hand it directly to your architect, structural engineer, or contractor.
This guide explains what each format is, who uses it, and how the new client–architect handover workflow works in practice.
A floor plan you design on GhanaHousePlanner is a complete spatial model — rooms, walls, doors, area calculations, and Ghana Building Code compliance data are all embedded. When you export it, that data goes with it.
Without proper exports, the design stays locked on one platform and someone has to redraw it from scratch — wasting time and introducing errors. With professional exports, your design becomes the starting point for the architect's work, not an attachment for them to manually trace.
File extension: .ifc Standard: IFC2x3 CoordinationView, ISO 10303-21 STEP format Used by: Architects, structural engineers, BIM coordinators
IFC is the universal open standard for Building Information Modelling (BIM). Every professional architecture tool — Autodesk Revit, Graphisoft ArchiCAD, Trimble Tekla, FreeCAD — can open an IFC file.
What is embedded in the GhanaHousePlanner IFC export:
This level of data is what architects expect when receiving a BIM-ready handover file. A structural engineer can immediately read wall loadbearing status, thermal values, and room areas without asking you for any additional information.
File extension: .dxf
Standard: DXF R2000 (AC1015) Used by: Architects, draughtsmen, structural engineers, planning departmentsDXF is the industry-standard 2D CAD exchange format created by Autodesk. It is supported by AutoCAD, QCAD, LibreCAD, BricsCAD, and virtually every other CAD application.
What is embedded in the GhanaHousePlanner DXF export:
The DXF is the right format for architects and draughtsmen who work primarily in 2D, and for submission to planning departments who may require a CAD file alongside the building permit application.
File extension: .gltf Standard: glTF 2.0 Used by: Architects for 3D visualisation, interior designers, clients reviewing designs
GLTF is the modern open-standard 3D format for real-time 3D. Blender, 3ds Max, Cinema 4D, and web-based viewers (Sketchfab, Three.js) can open it immediately.
GhanaHousePlanner generates the GLTF directly from the live 3D model in the browser — the same model you see in the 3D viewer — including wall geometry, room colour shading, doors, and all floor levels. An architect or interior designer can import this into Blender, add textures, materials, and lighting, and produce photorealistic renders for client presentations.
File extension: .png Used by: Sharing on WhatsApp, email, social media, or attaching to a document
A high-resolution screenshot of your current 3D view. Useful for quick sharing, project documentation, or including in a brief sent to a contractor or architect before the full file handover.
This is where the exports unlock a genuinely new working model for Ghana's construction sector.
Today, most Ghanaian homebuilders either:
Each of these approaches is slow, expensive, and often ends in a design that doesn't quite match what the client had in mind.
Step 1 — Client designs with Kwame AI
The client uses GhanaHousePlanner's AI assistant to describe their dream home in plain language: "3 bedrooms, 2 bathrooms, open living and kitchen, traditional style, ground floor master bedroom, verandah at the front." Kwame generates a Ghana Building Code-compliant floor plan instantly.
The client iterates — adding rooms, adjusting the style, checking the cost estimate — until the layout feels right. No architectural training required.
Step 2 — Client exports and invites the architect
Once happy with the layout, the client exports the IFC file (for BIM work) or DXF file (for 2D CAD work) directly from the 3D viewer. They share this file with their architect — or they use GhanaHousePlanner's collaboration features to invite the architect directly into the project.
Step 3 — Architect refines in their professional tools
The architect opens the IFC in Revit or ArchiCAD and sees a fully structured BIM model:
Instead of starting from a blank template, the architect starts from a client-validated layout with all the spatial decisions already made. Their job is refinement, structural detailing, and permit-ready sheet production — not decoding a client's hand-drawn sketch.
Step 4 — Architect delivers permit-ready drawings
The architect produces the full architectural and structural drawing set from the GhanaHousePlanner IFC base. The client already knows the layout is correct because they designed and reviewed it themselves. Revisions are minimal.
Don't already have an architect relationship? You don't need one to get a stamped, permit-ready plan. GhanaHousePlanner's Architect Review service puts the same review-and-sign-off step inside the platform — from your project's Cost Estimator or Floor Plan Editor, request a review and our in-house Lead Architect checks the AI-generated layout, fixes anything that needs fixing, and delivers the final drawing set and 3D views for a flat fee, without you having to find and brief an outside professional first. Not sure which route is right for you? Book a call with an expert and ask. The export workflow above is still there for anyone who already works with their own architect — it's a choice, not a requirement.
You arrive at your first architect meeting with a complete, professionally structured BIM file instead of a rough sketch. Your design intentions are unambiguous. You've already verified room sizes, costs, and Ghana Building Code compliance. The architect's time — and your money — is spent on structural engineering and permit drawings, not on re-explaining what you mean by "open plan."
You receive a qualified lead who has already made the fundamental design decisions. The IFC handover file means you don't redraw the floor plan from scratch. You open it in Revit or ArchiCAD, validate the structure, add your engineering details, and produce permit sheets.
For architects who want to offer GhanaHousePlanner as a client onboarding tool — directing new clients to design their initial layout before the first consultation — it reduces your intake meeting time significantly and increases the quality of the brief you receive.
The DXF export gives you a dimensioned 2D drawing with room areas for immediate bill-of-quantities preparation. The room area data in the IFC export can be used directly for material take-offs without manual measurement.
- IFC — for Revit, ArchiCAD, FreeCAD, or any BIM tool
- DXF — for AutoCAD, QCAD, LibreCAD, or any CAD tool
- GLTF — for Blender, 3ds Max, or 3D visualisation
- PNG — for quick sharing
The file downloads immediately. No account upgrade required for IFC and DXF on Starter and Pro plans.
Can my architect open the IFC file in Revit?
Yes. Autodesk Revit's IFC import (File → Open → IFC) supports IFC2x3, which is the standard GhanaHousePlanner uses. All room property sets, wall quantities, and materials will be visible in the imported model.
Does the DXF file work with QCAD and LibreCAD?
Yes. The DXF is written to the R2000 (AC1015) standard, which is supported by QCAD, LibreCAD, BricsCAD, and all versions of AutoCAD from 2000 onwards.
Is the floor plan in the IFC file in metres?
Yes. All coordinates and dimensions in the IFC and DXF exports are in metres. The IFC file sets IFCSIUNIT to metres and the DXF header sets INSUNITS to 6 (metres).
Can the architect edit the plan after importing the IFC?
Yes. The IFC import in Revit and ArchiCAD creates native elements (walls, rooms, doors) that can be edited, extended, and linked to structural and MEP systems. It is a starting point, not a locked file.
What Ghana Building Code data is embedded?
The IFC includes room areas validated against GS 1207:2018 (living room ≥ 13.47 m², main bedroom ≥ 11.15 m², other bedrooms ≥ 8.36 m², kitchen ≥ 7.43 m², bathroom ≥ 3.0 m²). Wall thermal transmittance values reflect standard sandcrete block construction common in Ghana.
Design your floor plan and export to IFC or DXF — free to start
Use our advanced cost calculator to get accurate estimates for your building project in Ghana
Discover how artificial intelligence is transforming house design and construction planning in Ghana. Learn about AI-powered floor plan generation, cost estimation, and smart construction management.
Learn how Ghana's first AI floor plan generator works, its benefits for homeowners and contractors, and how to get started with intelligent design automation.
Explore how AI and smart technology are transforming construction project management in Ghana. Learn about intelligent planning, cost optimization, and automated project tracking.