Cookies

We use analytics cookies to see which pages help people plan their build, so we can improve them. No ads, and we don't sell your data. You can change this any time under Cookie settings. Privacy policy

See what your house in Ghana will cost to build, before you start

The all-in-one platform for building in Ghana: free cost calculator, AI floor plans, a materials & labour marketplace, and construction management - whether you design with us or bring a house you're already building.

Cost calculator, AI floor plans, a materials marketplace and construction management, all in one place.

Building from abroad? Plan, price, and track your Ghana project with more control.

Where are you in building your house?

Get your estimate on WhatsAppCost estimates, material prices and suppliers, right in WhatsApp · no app, no sign-up

Building from abroad? Plan, price, and track your Ghana project with more control.

  • GS 1207:2018 Compliant
  • Made for Ghana
  • No credit card required
3D view generated from a GhanaHousePlanner floor plan
Example estimate

This house: 9 bedrooms · 3 storeys · 432 m²

Total estimated cost

GHS 1,795,565

Measured from the generated floor plan

walls
133
doors
43
windows
45
rooms
47
GS 1207:2018 checkRoom sizes & setbacks
Prices follow live material rates, so your figure will differ.
13,000+
Users in 2026
8,700+
Estimates since April
GHS 3,595
Average estimate per m² since April
16
Regions priced

One platform, three stages

From the first estimate to the day you move in

Most tools stop at a drawing. GhanaHousePlanner carries the same house from its cost, to a code-checked design, to the build itself, with self-serve tools and our team on call at every stage.

01 · Estimate

Know the real cost before you commit

Ghana-specific prices for every region, including the items informal quotes tend to leave out.

  • All 16 regions, priced from live material rates
  • Quantities measured from your floor plan: blocks, cement, rods, roofing
  • Labour, services and a contingency included, not added later

Our team can help

Example estimate3-bed · 85 m² · Greater Accra · standard finish
The cost calculator's result: 41 walls, 12 doors, 18 windows and 10 rooms measured from the floor plan, and a total estimated cost of GHS 304,465.21
  • Sandcrete blocks (6″)3,195
  • Cement177 bags
  • Iron rods (Y10–Y16)1,615 pcs
  • Roofing sheets46 sheets
  • Labour allowanceGHS 23,220
02 · Design

Design a house that meets the building code

Describe your home to the AI Design Agent, or upload a plan you already have. Either way, every room is checked.

  • Four layout options for every house, ready to edit
  • Every room checked against GS 1207:2018 minimum sizes
  • Walk through it in 3D, or get photographs of every room and a walkthrough video; drawing sets, DXF and IFC on paid plans

Our team can help

One house, three ways3-bed house · GS 1207:2018 check
Floor plan of a 3-bedroom house: a verandah, an open-plan living, kitchen and dining area, a corridor, and three bedrooms each with its own bathroom

The floor plan, every room checked against the building code

  • Living, kitchen & dining63.6 m² min 13.47
  • Master bedroom12.4 m² min 11.15
  • Bedrooms 2 & 312.4 m² min 8.36
  • Bathrooms5.6 m² min 3.0
03 · Construction

Keep control of your house construction, even from abroad

Bring a house you're already building, with us or anyone else, and run it like a project: phases, budget, team and documents in one place, with progress straight from the site.

  • Phases and documents tracked for free, no floor plan needed
  • Budget, cost forecast and team roles with Starter
  • Site photos and logs sent straight from WhatsApp
  • Questions to your team (RFIs) and milestone sign-off in writing

Our team can help

Example projectConstruction tracker
GhanaHousePlanner's construction tracker: 22% progress, an estimated 5 to 6 months, a rainy-season warning, and phases marked done and in progress
Budget usedGHS 128,500 / 302,418
Site log from WhatsApp: 3 photos, blockwork at lintel level
Foundation signed off by your supervisor
New · Designed for your brief

A house designed for your family, not picked from a catalogue

Kwame asks what an architect would: who lives with you, how big your plot is, which side the road is on, how you cook and host. Then it arranges the rooms around your answers. The layout options above are ready-made; this one is drawn from your brief.

  • Every room gets a window to the outside and a door onto a hall
  • Up to three designs for the same brief, side by side. Choosing one is free
  • Change it by chatting: add a study, move a door, put in a window
Watch on YouTube

Your free welcome credits cover your first design. Saving and downloading it need a Starter or Professional plan.

Watch: a house designed for a brief, with three designs compared

See It in Action

Watch a house plan come together in 2D and 3D, or click through the platform yourself before you sign up.

Watch: a house plan in 2D and 3D
Or take the interactive tour

Demo not loading? Open full-screen demo →

Everything else you need to build

Tools and services for every stage, and for the people who build for a living.

  • CornerStore MarketplaceFind materials, equipment, and skilled labour from suppliers when you're ready to buy.

Built for the real problems of building in Ghana

Design, compliance, cost, materials, and site supervision stay in one connected project — not scattered across separate calculators, marketplaces, and spreadsheets.

For Homeowners

  • Estimate your likely budget before you start
  • Get compliant designs that pass inspection (no rejections)
  • Buy materials at fair prices, escrow-protected until delivery, from rated suppliers
  • Free calculator with optional advanced tools

For Diaspora

  • Manage your project from USA, UK, Germany, or Canada
  • See real-time progress with site photos
  • Control budget and catch leakage immediately
  • More transparency before sending money

For Contractors

  • Access verified projects and material lists
  • Collaborate with homeowners and suppliers
  • Track timelines and budgets professionally
  • Build your reputation on CornerStore

For Suppliers

  • Connect directly with verified buyers
  • Grow your business on CornerStore
  • Fair pricing, no middleman markup
  • Reach diaspora investors with capital

Building from the Diaspora?

Watch how Ghanaians in the UK, USA, and Canada are using GhanaHousePlanner to plan, budget, and track their builds back home — without being on-site.

Tap to start — from anywhere

How GhanaHousePlanner compares

The only platform providing end-to-end building certainty for the Ghanaian market.

FeatureGhanaHousePlannerPlanner 5DMaramani
Ghana-Specific PricingAll 16 regionsGenericLimited
GhBC ComplianceBuilt-inNoNo
Project ManagementFree tierNoNo
Diaspora FeaturesReal-time trackingNoNo
Material SourcingCornerStore, with supplier ratings & reviewsNoLimited
Buyer Payment ProtectionEscrow, held until delivery confirmedNot offeredNot offered
Cost Accuracy±5-10%Varies widelyVaries widely
BIM Export (IFC · DXF · GLTF)Pro & StarterNot offeredNot offered
UCC & KNUST Research BackingValidatedNoneNone
Peer-Reviewed Research · University of Cape Coast & KNUST · 2026

Our Cost Model Is Backed by Academic Research

Not guesswork. Our pricing engine is validated by a parametric study that quantified Ghana's "Completeness Gap" — the systematic shortfall between informal contractor quotes and real construction costs.

29–98%
Typical gap between informal quotes and actual costs
6
Items systematically omitted from contractor quotes
3
Real Ghanaian homes independently validated

"A family budgets GHS 600,000 for a 3-bedroom home. Our research shows the actual cost is approximately GHS 790,000 — they are GHS 190,000 short before they break ground."

— Emmanuel Apaaboah & Bernard Opoku, University of Cape Coast / KNUST, 2026

Start with the cost. Build with fewer surprises.

Join thousands using GhanaHousePlanner to estimate costs, compare regions, and plan homes in Ghana.

No credit card required • Free cost calculator • Optional AI design, editor, exports, and project tools