Ghana Building Materials Prices April 2026

Live prices for cement, iron rods, sand, blocks, and key building materials across the 16 regions of Ghana. Updated whenever market prices change. Select your region to compare local rates.

Prices in Greater Accra

No prices available for Greater Accra. Try refreshing or selecting a different region.
MaterialUnitPrice

Ghana Construction Unit Rates 2026

Unit rates are the all-in cost (labour + materials) per measurable unit of work. Reference rates below are for Greater Accra — northern and inland regions are typically 10–15% higher.

Work ItemUnitRate (GH₵)
Grade 15 mass concrete (blinding / fill)520 – 600
Grade 20 concrete — in-situ slabs680 – 750
Grade 25 concrete — columns and beams750 – 850
Reinforced concrete slab (150mm thick)220 – 280
6-inch hollow sandcrete block (supply + lay)180 – 220
9-inch hollow sandcrete block (supply + lay)240 – 300
Internal plaster — two-coat finish55 – 75
External cement render65 – 85
Aluminium roofing sheet 0.45mm (supply + fix)95 – 120
Timber roof structure (supply + fix)130 – 180
PVC ceiling board (supply + fix)85 – 110
Ceramic floor tiles 600×600 (supply + lay)140 – 200
Internal painting — two coats25 – 40

Rates are indicative for Accra 2026 and include labour and materials unless stated. Use the free cost calculator for a project-specific BOQ.