Research · 2026/27 edition

Is your builder's quote complete?

The Building Cost Transparency Index scores a quote on the 16 items every finished house needs, each weighted by its share of the cost. Tick what your quote prices; see what's missing and what to ask before you sign.

  • Free, for any quote
  • 16 items, weighted by cost
  • Your answers stay in your browser

Score your quote

For each item: is it priced in the quote, only mentioned, or missing?

Structure
Foundation: excavation, concrete and footings9% of a complete house's cost
Steel for columns, beams, lintels and any slab (Y10, Y12, Y16)6% of a complete house's cost
Blockwork and the mortar to lay it13% of a complete house's cost
Plastering, both faces of every wall (its cement and sand)6% of a complete house's cost
Floor screed under the tiles3% of a complete house's cost
Roof
Roofing: timber, sheets or tiles, fascia, gutters and ceiling8% of a complete house's cost
Openings
Doors and windows: frames, glazing, locks and burglar-proofing5% of a complete house's cost
Services
Plumbing: pipes, fittings, sanitaryware, tanks and the pump7% of a complete house's cost
Electrical: cables, the board, sockets, switches, lights and earthing6% of a complete house's cost
Septic tank and soakaway (or the sewer connection)8% of a complete house's cost
Finishes
Finishes: tiles, paint and skirting3% of a complete house's cost
People
Labour, by trade (mason, carpenter, steel bender, plumber, electrician, painter)9% of a complete house's cost
Drawings, the building permit and supervision2% of a complete house's cost
Site
Connections: electricity (ECG) and water1% of a complete house's cost
Delivery of materials to the site2% of a complete house's cost
Allowance
A contingency of 10–15% for the unforeseen12% of a complete house's cost

About the index

Why it exists

Half-finished houses stand across Ghana: walls without roofs, roofs without plaster. Often the money ran out because the quote the build was planned on left out parts of the house: the plastering cement, the screed, the column steel, the septic tank. Our research on residential cost estimation calls the difference between a quote and the whole house the completeness gap. This index turns that idea into a check anyone can make on the quote in front of them.

How it's built

The 16 items are the parts of a complete house as the GhanaHousePlanner cost model prices them: foundation, structure, blockwork, plaster and screed, roof, openings, plumbing, electrical, drainage, finishes, labour, fees, connections, delivery and a contingency. Each item's weight is its rounded share of the cost of a complete 120 m², three-bedroom, one-storey house to a standard finish (Greater Accra price list, November 2026), grouped the way quotes are usually written. An item priced in the quote scores its full weight; one only mentioned, half; one missing, nothing.

How to use it

  • Building a house: score each quote before you sign, and send the builder the questions for what's missing. Compare quotes only once they're complete.
  • Journalists: cite the framework and its method. It's a self-assessment: it doesn't rate, rank or name any builder, developer or region, and shouldn't be used to.
  • Lenders and employers: ask for a quote's score with a construction loan or a staff housing scheme; a partial quote means the borrower will need more than the loan.

Limits

The weights come from one standard house; a large or luxury house shifts them (finishes weigh more). The bands are judgement, not yet tested against finished builds; we'll test them as projects on the platform finish and publish the result in the next edition. A complete quote isn't the same as a fair price: once it's complete, compare quantities and prices, or get a bill of quantities to compare against.

Cite as

GhanaHousePlanner Research (2026). Building Cost Transparency Index (BCTI), 2026/27 edition. https://ghanahouseplanner.com/research/building-cost-transparency-index. Licensed CC BY 4.0.