By accessing and using GhanaHousePlanner, you agree to be bound by these Terms of Service and all applicable laws and regulations. If you do not agree with any of these terms, you are prohibited from using this service.
Service Description
GhanaHousePlanner provides:
Construction cost estimation for Ghana (all 16 regions)
Material quantity calculations based on KNUST research
3D visualization and floor plan generation
Project management and construction phase tracking
Material shopping lists and construction timelines
What We Are:
An estimation and planning tool
A project management platform
A visualization tool
What We Are NOT:
Professional architectural or engineering services
A licensed contractor or builder
A substitute for professional consultation
A guarantee of final construction costs
CRITICAL: Floor Plans Are NOT Certified
All floor plans, 2D/3D visualizations, and designs generated on this platform are for CONCEPTUAL and IDEA PHASE purposes ONLY.
These plans are NOT certified architectural drawings and must NOT be used for actual construction.
Before Construction, You MUST:
Engage a licensed architect registered with the Ghana Institute of Architects (GIA)
Obtain certified architectural and structural drawings
Get approval from local planning authorities
Comply with Ghana Building Code and local building regulations
Hire a licensed quantity surveyor for accurate bills of quantity
Work with registered contractors for construction
Legal Notice: Using uncertified plans for construction may violate Ghana building regulations and could result in legal consequences, structural failures, or project rejection by authorities.
Disclaimers
Cost Estimates
Important: Cost estimates provided by Ghana House Planner are approximations based on market research and historical data. Actual construction costs may vary due to:
Market price fluctuations
Regional availability of materials
Contractor pricing
Site conditions and accessibility
Design complexity and customizations
Unforeseen circumstances
Professional Advice
GhanaHousePlanner is a planning tool and does NOT replace professional advice. Always consult with:
Licensed architects for design and planning
Structural engineers for safety and compliance
Licensed contractors for accurate quotes
Legal professionals for permits and regulations
Data Accuracy
While we strive for accuracy using data from VillaSharks, KNUST research, and ResearchGate, we cannot guarantee 100% accuracy. Users should verify all information with local suppliers and professionals.
User Accounts
Account Creation
You must sign in with Google to save projects
You are responsible for maintaining account security
One account per user
Must be 18+ years old to create an account
Account Termination
We reserve the right to terminate accounts that:
Violate these terms
Engage in fraudulent activity
Misuse the platform
Remain inactive for extended periods
Prohibited Uses
You agree NOT to:
Use the service for illegal purposes
Attempt to hack, reverse engineer, or disrupt the service
Share your account credentials
Upload malicious content or viruses
Scrape or extract data using automated tools
Impersonate others or provide false information
Use the service to spam or harass others
Intellectual Property
Our Content
All content, features, and functionality (including but not limited to text, graphics, logos, icons, images, and software) are owned by GhanaHousePlanner and are protected by Ghana and international copyright, trademark, and other intellectual property laws.
Your Content
You retain all rights to your project data. By using our service, you grant us a license to store and process your data solely to provide the service.
Third-Party Data
Cost data is derived from publicly available sources (VillaSharks, KNUST research, ResearchGate). We acknowledge and respect these sources.
Limitation of Liability
GhanaHousePlanner is provided "as is" without warranties of any kind. We shall not be liable for:
Inaccurate cost estimates or material calculations
Construction delays or cost overruns
Decisions made based on platform estimates
Data loss or service interruptions
Third-party service failures
Maximum Liability: In no event shall our liability exceed the amount you paid us (which is GH₵ 0, as the service is free).
Refund Policy
GhanaHousePlanner offers both free and paid subscription plans (Starter and Pro). This refund policy applies to all paid subscription services and premium features.
Subscription Plans
We offer monthly and yearly subscription plans. The following refund policy applies to all paid subscriptions:
Subscription Cancellation: You may cancel your subscription at any time. Cancellation takes effect at the end of your current billing period. You will continue to have access to paid features until the end of the period you've already paid for.
Refund Window: Refunds for subscription fees may be available within 14 days of the initial purchase or renewal, provided the service has not been substantially used (e.g., you have not generated multiple AI floor plans, created multiple projects, or heavily utilized premium features).
Partial Refunds: For yearly subscriptions, partial refunds for unused months may be considered on a case-by-case basis if cancellation occurs within the first 30 days and the service has not been substantially used.
Digital Products & Services
AI Floor Plan Generation: AI-generated floor plans and 2D/3D visualizations are delivered immediately upon generation. Due to the digital nature of these products, refunds are generally not available once the floor plan has been generated and downloaded, except in cases of technical failure on our part that prevents delivery or results in unusable output.
AI Design Agent Credits: Credits used for AI floor plan generation are non-refundable once consumed. Unused credits do not roll over to the next billing period and are not refundable.
Project Management Features: Premium project management features (collaboration, advanced analytics, etc.) are included as part of your subscription. Refunds for these features follow the same policy as subscription refunds.
Service Provider Engagements: Requesting a vetted Service Provider (e.g. a construction supervisor, architect, land verifier, or contractor) through GhanaHousePlanner requires a flat, one-time placement fee, paid before the engagement becomes active. If GhanaHousePlanner cancels an engagement before it becomes active, a refund of the placement fee will be considered. Once an engagement is active, the placement fee is non-refundable, as it covers GhanaHousePlanner's vetting and matching of the provider to your project — it is not a payment for the provider's own work, which is arranged and paid for separately between you and the provider — except where GhanaHousePlanner's own matching promise itself fails to hold, for example the matched provider never responds within a reasonable period. You may dispute an active engagement at any time, and GhanaHousePlanner will review it and issue a full or partial refund of the placement fee where warranted. This does not extend to dissatisfaction with the provider's own separately-paid work, which remains between you and the provider.
Architect Review: Requesting a review and professional stamp of your plan from GhanaHousePlanner's in-house Lead Architect requires a flat, one-time fee, paid before the request enters the review queue. Unlike a Service Provider Engagement, this fee is payment for work GhanaHousePlanner itself delivers. You may dispute a request at any time after payment — for example, if it goes unclaimed or unresolved for an unreasonable period, or the delivered review falls materially short of what was requested — and GhanaHousePlanner will review the dispute and issue a full or partial refund where warranted. A dispute is not a substitute for using the review-and-revise process first where changes are requested; refunds are reserved for cases where that process fails to resolve the issue.
Refund Eligibility
Refunds may be considered in the following circumstances:
Technical failure on our part that prevents you from accessing or using a paid feature
Duplicate charges or billing errors
Service discontinuation before the end of your paid period
Request made within 14 days of purchase for unused services
Non-Refundable Items
The following are not eligible for refunds:
Floor plans or visualizations that have been successfully generated and downloaded
Services that have been substantially used or consumed
Refunds requested more than 30 days after purchase
Refunds for dissatisfaction with cost estimates or material calculations (as these are estimates, not guarantees)
Refunds for changes in market prices or construction costs
Refund Process
To request a refund for a paid subscription, please contact us at [email protected] with:
Your account email address
Date of purchase
Reason for refund request
Transaction ID or receipt (if available)
We will review your request within 5-7 business days and respond via email. Approved refunds will be processed to the original payment method within 10-14 business days.
Important: Free plan users are not eligible for refunds as no payment is required. This refund policy applies only to paid Starter and Pro subscription plans. We reserve the right to modify this refund policy with 30 days notice. Any changes will be communicated via email to active subscribers.
Service Availability
We strive for 99% uptime but do not guarantee:
Uninterrupted access to the service
Error-free operation
Compatibility with all devices/browsers
Permanent availability (we may discontinue)
We may perform maintenance, updates, or improvements that temporarily affect availability.
Changes to Service
We reserve the right to:
Modify or discontinue features
Update pricing data and calculations
Change these terms with notice
Add or remove supported regions
Governing Law
These Terms shall be governed by and construed in accordance with the laws of Ghana. Any disputes shall be resolved in the courts of Ghana.
🇬🇭 GhanaHousePlanner offers a free plan that will remain free forever for all Ghanaians. We are committed to helping you build your dream home with accurate, research-based information.
Free plan available forever • No credit card required for free plan • Optional paid subscriptions for advanced features
Our free plan includes cost estimation, 3D visualization, material shopping lists, and basic construction tracking. Paid Starter and Pro plans offer additional features like AI Design Agent, unlimited projects, team collaboration, and advanced analytics.