Is an AI-generated floor plan legal for an MMDA permit in Ghana? Here's how GhanaHousePlanner's Architect Review service gets your plan checked, fixed if needed, and stamped by a licensed in-house architect — without you having to find one yourself.
If you've designed a floor plan with GhanaHousePlanner's AI Design Agent, you already have a layout that's checked against Ghana Building Code (GS 1207:2018) room minimums automatically. That's real, and it catches a lot of the mistakes that make self-built homes non-compliant in the first place.
But an algorithm checking room dimensions is not the same thing as a licensed professional putting their name and stamp on a set of drawings. If you're planning to submit for a Metropolitan, Municipal, or District Assembly (MMDA) permit, or you just want a second, qualified pair of eyes before you break ground, that's where Architect Review comes in.
"Who signs off on this?"
It's the right question. Ghana's self-build reality is that most homes go up without ever being seen by an architect — the exact gap between "AI floor plan" and "permit-ready, professionally-approved drawing set" that Architect Review closes.
Architect Review is a paid add-on on top of your GhanaHousePlanner subscription — it's not something every plan gets automatically, and it's not bundled into every account. You request it, pay a flat one-time fee, and it goes into a review queue for the company's in-house Lead Architect.
From there, one of two things happens:
Either way, once approved, the architect prepares and delivers:
All of it lands in your project as one downloadable package — signed off by a real person, not just a compliance algorithm.
You don't need to already know an architect or go looking for one. Architect Review is reachable directly from inside the tools you're already using:
Submit the request, pay the fee, and you can track exactly where it is — Requested, In Review, Approved, Delivered — without leaving your dashboard.
Ghana's proptech tools mostly stop at one stage: a listing site finds you a property, a valuation tool prices it, a plan-seller sells you a static drawing. Almost none of them carry a design through to something a bank, a contractor, or an MMDA will actually accept as professionally validated.
Two academic facts make the case for getting this right the first time. A 2026 University of Cape Coast/KNUST parametric study found a 29–98% "completeness gap" between informal contractor quotes and real construction cost — with six cost items systematically left out of typical quotes. Getting the design stage wrong compounds every later stage: wrong rooms, wrong compliance, wrong cost, wrong materials order. A professional review at the design stage is the cheapest place in the whole build to catch a mistake.
That's fine too — Architect Review isn't a requirement, it's an option. You can still export your plan as IFC, DXF, or PDF and hand it to an architect or engineer you already work with. Architect Review exists for everyone else: people who don't have that relationship yet and don't want the design-to-permit path to depend on finding one.
If you already have a project with a generated floor plan, open your Cost Estimator or project dashboard and look for Architect Review. If you're not sure whether this is the right next step for your project, book a free call with an expert first — land registration, construction-cycle questions, and platform help are all fair game too.
Use our advanced cost calculator to get accurate estimates for your building project in Ghana
Building permit fees 2026: Residential ₵200-500, Commercial ₵1,000-5,000. Get approval in 6-12 weeks. Free checklist of 15 required documents + step-by-step application guide.
Everything you need to know about Ghana Building Code (GhBC 1207:2018). Compliance requirements, design standards, permit process. Build legal, build safe.
Adding a room, a second storey, or renovating an older Ghanaian house all require permits and GhBC compliance checks — not just new builds. What to check before you extend.