The same house, costed in every region of Ghana. Its total varies by only a few percent; what you pay for varies far more.
| Region | Cost | Per m² | vs Accra | Manufactured | Local & labour |
|---|---|---|---|---|---|
| Western | GHS 350,372 | GHS 2,920 | +2.0% | ×1.05 | ×0.98 |
| North East | GHS 348,035 | GHS 2,900 | +1.3% | ×1.17 | ×0.80 |
| Upper East | GHS 347,140 | GHS 2,893 | +1.0% | ×1.18 | ×0.78 |
| Upper West | GHS 347,140 | GHS 2,893 | +1.0% | ×1.18 | ×0.78 |
| Northern | GHS 347,025 | GHS 2,892 | +1.0% | ×1.15 | ×0.82 |
| Savannah | GHS 347,025 | GHS 2,892 | +1.0% | ×1.15 | ×0.82 |
| Western North | GHS 345,898 | GHS 2,882 | +0.7% | ×1.10 | ×0.88 |
| Greater Accra | GHS 343,646 | GHS 2,864 | 0.0% | ×1.00 | ×1.00 |
| Ahafo | GHS 342,982 | GHS 2,858 | −0.2% | ×1.07 | ×0.90 |
| Bono | GHS 342,088 | GHS 2,851 | −0.5% | ×1.08 | ×0.88 |
| Bono East | GHS 341,698 | GHS 2,847 | −0.6% | ×1.10 | ×0.85 |
| Oti | GHS 339,287 | GHS 2,827 | −1.3% | ×1.08 | ×0.86 |
| Volta | GHS 338,277 | GHS 2,819 | −1.6% | ×1.06 | ×0.88 |
| Central | GHS 338,161 | GHS 2,818 | −1.6% | ×1.03 | ×0.92 |
| Ashanti | GHS 336,645 | GHS 2,805 | −2.0% | ×1.00 | ×0.95 |
| Eastern | GHS 336,371 | GHS 2,803 | −2.1% | ×1.05 | ×0.88 |
Each part of the cost takes the region's factor for what it's made of. Cement, steel, roofing sheets and fittings come from the factories and ports of the Tema–Accra corridor, and carry the transport to the region (the manufactured factor). Sand, stone, blocks made on site and labour are local, and cheaper away from Accra (the local factor).
| Part of the house | Greater Accra | Upper East | Change |
|---|---|---|---|
| Labour | GHS 31,866 | GHS 24,856 | -22% |
| Roofing | GHS 27,955 | GHS 31,310 | +12% |
| Doors and windows | GHS 16,463 | GHS 18,767 | +14% |
| Plumbing and electrical | GHS 42,700 | GHS 45,262 | +6% |
| Foundation | GHS 45,840 | GHS 44,923 | -2% |
| Blockwork | GHS 45,600 | GHS 45,600 | 0% |
| Finishes | GHS 11,222 | GHS 11,446 | +2% |
The reference house: 120 m², three bedrooms, two bathrooms, one storey, a standard finish, with its foundation, structure, blockwork, plaster and screed, roof, doors and windows, plumbing, electrical, septic tank and soakaway, air conditioning provision, finishes, fees, connections and a contingency, as the GhanaHousePlanner cost engine prices a complete house.
Prices: the platform's price list of 111 items as of 26 November 2026, Greater Accra market rates. Regions: each cost category takes a blend of its region's factor for manufactured goods and for local materials and labour. The factors are the platform's own estimates of the transport premium and of local rates, reviewed as supplier prices come in.
These figures come from today's cost engine. They aren't directly comparable with the case studies of our 2026 paper, which used the platform's first-generation model.
One house, one finish: a luxury finish weighs manufactured goods more, and widens the gap. The factors are regional averages; a remote site within a region pays more for delivery (the calculator adds it by distance). Labour rates vary by town and season more than any average shows.
November 2027, with the factors checked against supplier prices collected in each region.
GhanaHousePlanner Research (2026). Ghana Regional Construction Cost Index, 2026/27 edition. https://ghanahouseplanner.com/research/regional-construction-cost-index-2026. CC BY 4.0.