What a complete house costs to build in Ghana this year, where the money goes, how it changes by region and finish, and what's driving it.
Edition 1 is the baseline year: there's no earlier edition to compare with. Its figures come from today's GhanaHousePlanner cost engine, and aren't directly comparable with the case studies of our 2026 paper, which used the platform's first-generation model.
Each a complete house in Greater Accra: structure to finishes, services, septic tank, fees and contingency.
| House | Basic | Standard | Luxury | Standard /m² |
|---|---|---|---|---|
| 75 m² · 2-bed starter home, one storey | GHS 192,853 | GHS 223,407 | GHS 291,631 | GHS 2,979 |
| 120 m² · 3-bed family home, one storey | GHS 295,044 | GHS 343,646 | GHS 452,234 | GHS 2,864 |
| 160 m² · 3-bed, 3-bath, one storey | GHS 381,693 | GHS 446,093 | GHS 590,073 | GHS 2,788 |
| 200 m² · 4-bed, two storeys | GHS 490,626 | GHS 562,764 | GHS 726,015 | GHS 2,814 |
| 280 m² · 5-bed, two storeys | GHS 681,655 | GHS 783,346 | GHS 1,013,292 | GHS 2,798 |
Larger houses cost a little less per square metre: the septic tank, fees and connections are shared over more floor area.
The 120 m² house at a standard finish, GHS 343,646 in all:
| Part | Cost | Share |
|---|---|---|
| Foundation | GHS 45,840 | 13.3% |
| Blockwork | GHS 45,600 | 13.3% |
| Contingency | GHS 43,715 | 12.7% |
| Plumbing and electrical | GHS 42,700 | 12.4% |
| Labour | GHS 31,866 | 9.3% |
| Septic tank and soakaway | GHS 29,500 | 8.6% |
| Finishes (tiles, paint, ceiling) | GHS 28,707 | 8.4% |
| Roofing | GHS 27,955 | 8.1% |
| Doors and windows | GHS 16,462 | 4.8% |
| Air conditioning provision | GHS 14,600 | 4.2% |
| Fees, permit and connections | GHS 12,500 | 3.6% |
| Verandah | GHS 4,200 | 1.2% |
The structure (foundation and blockwork) is about a quarter of the house; services and drainage almost as much. Those are the parts a quote most often leaves out or underprices: check yours with the Building Cost Transparency Index.
The same house costs from GHS 336,371 (Eastern) to GHS 350,372 (Western); Greater Accra GHS 343,646. Away from the Tema–Accra corridor, cement, steel and roofing cost up to 18% more and labour, sand and stone up to 22% less. The full table and what drives it: the Regional Construction Cost Index 2026/27.
| Material | First record | Highest | Latest |
|---|---|---|---|
| Cement, a 50 kg bag | GHS 88 (Mar 2024) | GHS 108 (Jun 2024) | GHS 90 (Oct 2026) |
| Blocks, a block | GHS 13 (Apr 2024) | GHS 13 (Apr 2024) | GHS 11 (Oct 2026) |
| Y12 rods, a 6 m length | GHS 235 (Apr 2024) | GHS 235 (Apr 2024) | GHS 200 (Aug 2025) |
Cement rose by almost a quarter in the first half of 2024 and has since eased; blocks and Y12 rods drifted down through 2024 and 2025. Prices change by supplier and week: the live material prices show today's.
From the platform's own use, anonymised. Between 20 May and 26 November 2026 the cost calculator ran 3,878 estimates in 1,142 sessions. Of the 158 sessions whose country is known, 76 (48%) came from abroad: the United States, the United Kingdom, France, Germany and Canada first. Building in Ghana is planned from the diaspora as much as at home.
| Projects saved on the platform | Count | Share |
|---|---|---|
| 1 bedroom | 10 | 5% |
| 2 bedrooms | 19 | 10% |
| 3 bedrooms | 100 | 50% |
| 4 bedrooms | 57 | 28% |
| 5 bedrooms | 6 | 3% |
| 6+ bedrooms | 8 | 4% |
| One storey | 126 | 63% |
| 2 storeys | 62 | 31% |
| 3 storeys | 8 | 4% |
| 4 storeys | 4 | 2% |
200 projects by 67 owners, a median of 120 m²: half are three-bedroom houses, a third have two storeys or more. These counts include some test and demonstration projects, and are a young platform's, not a national sample.

Every figure comes from the GhanaHousePlanner cost engine as it runs on the platform today: each house priced category by category (foundation, structure, blockwork, plaster and screed, roof, openings, plumbing, electrical, drainage, air conditioning provision, finishes, fees, connections) on the platform's price list of 111 items (26 November 2026, Greater Accra), with a contingency. Regions take the factors of the Regional Cost Index. Material prices are the platform's recorded series. Demand counts are anonymised aggregates of the calculator's use and of saved projects; no person or project is identifiable.
Engine figures, not tendered prices: a real quote varies with the site, the builder and the week. Labour is priced at average rates; informal labour varies more. The demand figures are a young platform's users, many of whom opened the calculator with its default house. Edition 2 will compare with this one, and test the figures against completed projects on the platform.
GhanaHousePlanner Research (2026). Ghana Residential Construction Cost Report, Edition 1 (2026/27). https://ghanahouseplanner.com/research/ghana-residential-construction-cost-report-2026. CC BY 4.0.