What MEP drawings are, what a Ghanaian house needs (wiring and the board, water tanks and pumps, the septic tank and soakaway, air conditioning), how big each part should be, and how to get a set made from your floor plan and signed by a registered engineer.
Your architect's drawings show the walls, doors and windows. They don't show where every socket goes, how thick the cable to the kitchen should be, how big the septic tank must be, or where the AC's outdoor unit hangs. Those are the MEP drawings: mechanical, electrical and plumbing. Without them, your electrician and plumber decide on site, and you pay for the changes later.
GhanaHousePlanner now makes all three sets from your floor plan: MEP drawings for your house.
For every room, the points it needs, and the circuits that feed them:
Backup power is planned in, not added later: tell us inverter, solar or generator, and the lights, fridge and living-room sockets go on an essential section that stays on when the power goes.
The formula: 180 litres for each person, plus 2,000 litres, and never less than 2,720 litres, in two chambers.
The soakaway depends on your soil. A percolation test (a hole, filled with water, timed as it drains) gives the figure; until you have one, we size it for a moderate soil and the drawing says so plainly.
You can plan for AC now and buy the units later: the pipes, sleeves and outlets go in during the build, when it's cheap.
The three sets are made from the same plan, then checked together. Our MEP check lists what doesn't fit and what to do: a socket too close to the sink, a shower without its water-heater circuit, an AC without an outlet, a drain under the house. You fix it on paper, not with a chisel.
The sets are designed by our engine and checked by our rules; that's not the same as an engineer's signature. Every sheet says "for engineer's review" until one reviews it. Ask for a review on the Drawings page: a registered engineer checks your set, marks it up and signs it, and their name and registration print on the sheets.
The signature belongs to the plan they signed. Move a wall or change a choice, and the sheets stop printing it until the new version is reviewed, so a signed drawing always matches what was signed.
More about the drawings: architectural and structural drawings for your house.
Use our advanced cost calculator to get accurate estimates for your building project in Ghana
See your house before it's built: a photograph of every room and a walkthrough video, from a photo or PDF of your floor plan, an ArchiCAD or Revit IFC, an AutoCAD DXF, or your 3D model. What you get, what to upload, the price, and how architects and developers use it.
Turn your 2D floor plan into 3D house views, architectural sheets, and structural layouts. Learn what each drawing includes, why dimensions matter, and how to prepare for architect/engineer validation in Ghana.