Cookies

We use analytics cookies to see which pages help people plan their build, so we can improve them. No ads, and we don't sell your data. You can change this any time under Cookie settings. Privacy policy

Chat on WhatsApp
Review and sign

Your house plans, checked and signed.

A registered architect and engineers review the drawing sets made from your plan, mark up what needs changing, and sign. Their name and registration then print on every sheet.

  • Architect, structural and MEP
  • Architect Review GHS 2,000, flat
  • The signature follows the plan

Who reviews what

Architect

The floor plan and the architectural set: plans, elevations, sections, roof, site plan and schedules, against GS 1207 and what the Assembly asks for.

GHS 2,000, flat

Structural engineer

Foundations, columns, beams, slabs and stairs: the sizes, the steel, the soil's bearing pressure, every upstairs wall carried.

Shown before you pay

Electrical engineer

Every point and circuit, the cables and protection, the distribution board, the maximum demand and earthing.

Shown before you pay

Plumbing engineer

Water supply, storage and pump, soil and waste with their stacks, the septic tank, soakaway and rainwater.

Shown before you pay

Mechanical engineer

Air conditioning sized room by room, outdoor units and their drains, extract fans in every inner wet room.

Shown before you pay

Why a review, not a design from scratch

A professional who draws a house from nothing spends most of the fee on drafting. Here the drawings already exist: the architectural set, and the structural and MEP sets designed from your plan by rule. The reviewer's time goes to what only a professional can do: judgement, the site, and taking responsibility.

Every sheet says "for review, not for construction" until it's signed. After an edit, the sheets say the plan has changed since the review, until the new version is reviewed.

Frequently asked questions

What does the reviewer's signature mean?

A registered professional has checked the drawings and takes responsibility for them: their name, registration number and the date print in the approval block of every sheet of the set they reviewed.

What if the plan needs changes?

The reviewer lists them. The changes are yours to make, in the design chat or the editor, or our team can make them for a fee quoted for the work. The reviewer signs once everything is agreed.

What happens if I change the plan after it's signed?

The signature belongs to the plan it was given for. Move a wall and the sheets stop printing it, saying the plan has changed since the review, until the new version is reviewed. A signed drawing always matches what was signed.

Why is an engineer's review cheaper than a design from scratch?

Because the set is already drawn. Our engines design the structure and services from your plan by rule and draw them in full, so the engineer's time goes to checking and judgement rather than drafting.

Is a reviewed set enough for a building permit?

The sets contain what Assemblies ask for, and a signed set carries the professional's name and registration. Requirements vary by Assembly: check yours, and include the site plan and any documents it asks for.