Structural Drawings for a House in Ghana: Foundations, Columns, Beams and Slabs, and the Engineer's Signature [2026]

What a structural drawing set for a Ghanaian house contains, what a structural engineer checks before signing it, why the soil test matters, and how to get a set made from your floor plan for an engineer to review rather than draw from scratch.

GhanaHousePlanner Team
11/27/2026
6 min read
structural drawings Ghanastructural engineer Ghanafoundation design Ghanacolumn and beam sizesbuilding permit drawings Ghana

Structural Drawings for a House in Ghana

The architectural drawings show what the house looks like. The structural drawings show what holds it up: how big each footing is, where the columns stand, how deep each beam is and how much steel goes in it. They're what the mason, the carpenter and the steel bender build the frame from, and what the Assembly asks to see with your permit application.

What's in a structural drawing set

A complete set for a house, on A3 sheets:

SheetWhat it shows
S0.01 Design basisThe codes (BS 8110 concrete, BS 6399 loads, BS 8004 foundations, GS 1207), the loads and safety factors, the concrete grade (C25), the steel (high-yield Y bars), the covers, and the soil's bearing pressure
S1.01 Foundation planEvery pad and strip footing on the building's grid, with a footing schedule: sizes, depth and bars
S1.0x Column scheduleEvery column's size and bars, floor by floor
S2.0x Slab and beam layoutsEach floor and the roof: every beam and slab marked, sized by its span
S3.01 Beam scheduleEvery beam's size, its bars top and bottom, and its links
S3.02 Typical detailsFootings, columns, beams, a slab at its support, lintels, the stairs, the roof

The concrete and steel quantities come from the same design, so the bill of quantities prices the steel that's actually drawn.

What decides the sizes

▸The soil. Footings are sized from the ground's bearing pressure. Until trial pits give it, the drawings assume a figure (often 150 kN/m²) and say so. On weak or filled ground the footings grow.

▸The spans. A beam's depth follows its span: about a twelfth of the span for a floor beam. A long living room means deeper beams or a column in the middle.
▸What's above. A wall upstairs stands on a wall or a beam. Where an upstairs wall or column has nothing under it, a transfer beam carries it, sized for the load. Plans whose upstairs walls stand over the walls below cost less to build.
▸The stairs. A storey of 3.0 m takes 16 risers of 187.5 mm, within LI 1630's limits.

What the engineer checks and signs

A registered structural engineer takes responsibility for the frame. Before signing they check that:

1The design basis is right for the site: the soil, the loads, the materials
2Every footing, column, beam and slab is big enough, with the right steel
3Every upstairs wall and column is carried, and every transfer beam is designed
4The drawings agree with the architectural set: no column in a doorway, no beam under no wall
5The details are enough to build from

They mark up what needs changing and sign. Their name and registration then go on every sheet.

Getting a set without paying for a design from scratch

An engineer who draws a house's structure from nothing spends most of the fee on drafting. GhanaHousePlanner designs the frame from your floor plan by rule and draws the full set above, so the engineer's time goes to checking and judgement instead.

1Design your house with the AI design chat, or upload the plan you have
2On your floor plan, press Download and choose Structural set (PDF), or open the Drawings page to set the roof and the soil's bearing pressure first
3Ask for an engineer's review on the Drawings page: a registered engineer checks the set, marks it up and signs it. The fee is shown before you pay.

Every sheet says "for engineer's review, not for construction" until it's signed. Change the plan after the review and the signature stops printing until the new version is reviewed, so a signed drawing always matches what was signed.

More about the rest of the set: architectural drawings and electrical, plumbing and mechanical drawings.

Ready to Start Your Construction Project?

Use our advanced cost calculator to get accurate estimates for your building project in Ghana

Related Articles

Electrical, Plumbing and Mechanical (MEP) Drawings for a House in Ghana [2026 Guide]

What MEP drawings are, what a Ghanaian house needs (wiring and the board, water tanks and pumps, the septic tank and soakaway, air conditioning), how big each part should be, and how to get a set made from your floor plan and signed by a registered engineer.

GhanaHousePlanner Team
11/15/2026
7 min read
Read More

3D House Renders in Ghana: Every Room, a Walkthrough Video and a 360° Tour of Your House [2026]

See your house before it's built: a photograph of every room and a walkthrough video, from a photo or PDF of your floor plan, an ArchiCAD or Revit IFC, an AutoCAD DXF, or your 3D model. What you get, what to upload, the price, and how architects and developers use it.

GhanaHousePlanner Team
11/12/2026
6 min read
Read More

Architectural & Structural Drawings in Ghana 2026: The Full Drawing Set From Your Floor Plan

A floor plan is one drawing; a builder, the Assembly and your engineers need the set. On a paid plan, downloading your floor plan gives you the whole architectural set (site plan, every floor, elevations, sections, roof plan, schedules), with the structural and MEP sets beside it.

GhanaHousePlanner Team
11/26/2026
6 min read
Read More