The all-in-one platform for building in Ghana: free cost calculator, AI floor plans, a materials & labour marketplace, and construction management — from first sketch to move-in day.
Building from abroad? Plan, price, and track your Ghana project with more control.
Before you send money, hire a contractor, or break ground, get a realistic budget for your home. Compare all 16 regions, see the hidden costs, and plan with fewer surprises.
No credit card required • Free cost calculator • Optional AI design, editor, exports, and project tools 🇬🇭
Follow along with an interactive demo — click through each step and learn how to design your floor plan before you sign up
Demo not loading? Open full-screen demo →
Start with a free estimate, then move into design, materials, and project tracking when you are ready.
Estimate your likely build cost using Ghana-specific pricing across all 16 regions.
AI floor plans follow Ghana's building code — room sizes, setbacks, and structural rules built in.
Describe the home you want and generate a starter floor plan you can refine.
Have a house plan from another designer or architect? Upload a photo or PDF and we'll rebuild it as a compliant, costed design — flat fee, no redrawing.
Track phases, materials, and budgets as your project moves from planning to construction.
Find materials, equipment, and skilled labour from suppliers when you're ready to buy.
Verified site logs, milestone payments, and defect tracking — for owners who can't be on-site daily.
Get matched with a licensed architect, verify a land title before you buy, or request a vetted site supervisor — fee quoted upfront.
Export floor plans as IFC, DXF, or GLTF — ready for architects and engineers to build on.
Move from rough idea to realistic budget quickly.
Choose your region, house type, rooms, size, and finish level.
Review materials, labour, regional effects, and likely hidden costs before you commit money.
Refine your floor plan, share your estimate, source materials, or start tracking the project.
Watch how investors use GhanaHousePlanner to plan chamber & hall rental construction — from AI floor plan to full 3D walkthrough — before spending a cedi on materials
Accurate pricing and materials for Ghanaian construction




Design, compliance, cost, materials, and site supervision stay in one connected project — not scattered across separate calculators, marketplaces, and spreadsheets.

Watch how Ghanaians in the UK, USA, and Canada are using GhanaHousePlanner to plan, budget, and track their builds back home — without being on-site.
The only platform providing end-to-end building certainty for the Ghanaian market.
| Feature | GhanaHousePlanner | Planner 5D | Maramani |
|---|---|---|---|
| Ghana-Specific Pricing | All 16 regions | Generic | Limited |
| GhBC Compliance | Built-in | No | No |
| Project Management | Free tier | No | No |
| Diaspora Features | Real-time tracking | No | No |
| Material Sourcing | CornerStore, with supplier ratings & reviews | No | Limited |
| Buyer Payment Protection | Escrow, held until delivery confirmed | — | — |
| Cost Accuracy | ±5-10% | Could be extreme | Could be extreme |
| BIM Export (IFC · DXF · GLTF) | Pro & Starter | — | — |
| UCC & KNUST Research Backing | Validated | — | — |
Not guesswork. Our pricing engine is validated by a parametric study that quantified Ghana's "Completeness Gap" — the systematic shortfall between informal contractor quotes and real construction costs.
"A family budgets GHS 600,000 for a 3-bedroom home. Our research shows the actual cost is approximately GHS 790,000 — they are GHS 190,000 short before they break ground."
— Emmanuel Apaaboah & Bernard Opoku, University of Cape Coast / KNUST, 2026
Planning to build your own home? You're already covered above. Learning to design, or managing a full project portfolio? We've built a dedicated path for that too.
Design a floor plan and get instant Ghana Building Code compliance feedback — free, no payment required.
Manage every project from one dashboard — reusable layouts, drawing/DXF exports, and bill of materials.
Join hundreds using GhanaHousePlanner to estimate costs, compare regions, and plan homes in Ghana.
No credit card required • Free cost calculator • Optional AI design, editor, exports, and project tools 🇬🇭